Three Quantity: requirement quantity schedule planning quantity and stock quantity. 三量:需求量。排配量。库存量。
The quality, quantity, unit price, packing and delivery schedule shall also be specified in an additional contract, which shall constitute an integral part of this contract. 彩电的质量、数量、单价、包装和交货日程安排,亦由双方另行签订合同,作为本合同不可分割的一部分。
When you are selling and have accepted a purchase or an order, or when the buyer has paid, always deliver the good or service according to the agreed quantity, quality, and delivery time schedule. 接受了别人的购买或订单或别人付了钱时,就一定把货物或服务按照约定的数量、质量及时间供应。
Through active promotion of the standard, production and construction require-ments on power material procurement are met in quality, quantity and delivery schedule and the procurement cost is lowered. 通过积极推行标准,达到保证电力物资采购在质量、数量、供贷时间上满足生产,建设的要求,并降低了采购成本。
However, this transition has put forward higher demand for the quantity and quality of teacher, and the evaluation of teaching quality has also brought into schedule. 然而,这一转变也对高校的教师数量与质量提出了更高的要求,教师教学质量评价问题也就提上了日程。
Considering the large foundation excavation quantity and tight time schedule, as well as the deep down excavation near the existing plant site, the presplit blasting is regarded as the key factor in speeding up the construction progress and ensuring the project safety and quality. 乐滩水电站扩建工程基础开挖不仅工程量大、工期紧,而且临近旧厂坝,下挖深度大,搞好预裂爆破施工,是加快开挖施工进度、实现基础开挖工程安全和质量目标的保证。
Considering the large work quantity and tight time schedule for the curtain grouting in Bid I of Letan project, drilling speed is the most critical factor in the construction progress. 乐滩水电站I标工程帷幕灌浆工程量大,工期紧,影响施工速度的最大因素是钻孔速度。
The rail transit, which is heavy luck quantity, on schedule, little land utilized, little pollution, offers the effective settlement way which solve the city traffic, land use, the city continue and harmonious city development. 大运量、准点、占地面积小、污染少的轨道交通为解决城市交通、土地利用以及城市的协调永续发展提供了有效的解决途径。
For the past four years, the construction quantity and configuration progress of the most items have been fulfilled on schedule, with construction quality meeting design requirements and investment controlled under contract price. 4年来,主要工程项目大多能按进度计划完成或接近完成其工程量与形象进度,质量能满足设计要求,投资控制在合同报价之内。
In order to quantitatively conduct the application of engineering construction and generally master relevant reference or quantity criterion that could evaluate schedule and cost of engineering project, this paper has grasped the first-hand datum by using construction project questionnaire. ⑶为了能定量指导工程建设的实施,掌握具体的作为控制、评价工程项目工期与成本的参考标准或数量标准,本文采用《建设项目调查表》的方式掌握了第一手的数据资料。
The Cache schedule policy plays an important role in disks 'operating, the quantity of schedule policy affects the performance of disk I/ O directly. Cache调度策略在磁盘操作中占着举足轻重的地位,调度策略设计的好坏直接影响着磁盘I/O性能。
Under the condition of water shortage, the system might supervise the allocation of water amount on the basis of time so as to minimize the reduction of output, and the quantity of yield reduction under optimal irrigation schedule could be forecasted. 在供水量不足的情况下,系统可指导如何在时间上分配水量以使减产最小,且可得知在这种灌溉方式下的具体减产量。
On the basis of theoretic drip irrigation water quantity and irrigation period, the irrigation schedule for mango in different soil was predicted, too. 同时根据节水灌溉理论上的滴灌灌水量和灌水周期计算公式预测出了攀枝花市芒果在不同土质中栽培的灌水制度。
Process of measurement and payment in a highway project controls the engineering quantity, payment amount, material, schedule etc. of the whole project. It is the key to the whole business of construction and supervision, and it has very important influence on them. 公路工程计量支付控制着整个公路工程的工程量、支付金额、材料、进度等,是整个施工、监理业务的关键,起着非常重要的作用,直接影响了施工和监理工作的效率和进度等。
The cutoff wall of the cofferdam has large depth, large quantity, tight construction schedule and passing through all kinds of strata. 防渗墙深度大、工程量大、工期紧,且还要穿过各种复杂地层。
With the increasing quantity of college students, the size of data and the constraints grow lager. Under the limited teaching resources, curriculum scheduling problem has become more and more complex. Artificial course scheduling has been difficult to complete the schedule arrangement work requirements. 随着高校学生数量猛增,数据规模增大、约束条件增多,在教学资源一定的情况下排课越来越复杂,人工排课已经难以满足课表编排的工作要求。
In the dynamic scheduling process, the decision agent needs to rebuild the supply chain and its optimal production and transportation planning according to the demand changing quantity and the executive situation of the old schedule. 动态调度中决策主体需要根据需求增加或降低,以及在决策时刻原调度计划执行状态的基础上进行供应链系统的重构,制定最优的生产和运输调度计划。
Due to a variety of random factors, in terms of time, quantity, quality and cost, the physical production schedule and the scheduled operation plan will deviate during the actual production. 而且,实际生产过程中,由于受到各种随机因素的影响,实际生产进度和预定的作业计划会发生偏差。
The theoretical results show that the theme park can coordinate with the tour operator through a quantity discount schedule. 结果显示主题公园可以通过数量折扣协调旅行社,从而达到系统最优。
If you want to understand the progress of the new model project thoroughly and specifically, so the production preparation work of the parts, quality and quantity guaranteed, can meet the project schedule requirements, it will be difficult. 想要全面具体地了解新车型项目进展情况,使零部件的生产准备工作保质保量满足整车项目的进度计划要求,比较困难。